Back to projects
Tertiary Education
![](https://rpinfrastructure.com.au/wp-content/uploads/2021/07/200605_Grimshaw_Woodside-2055-800x478-c-default.jpg)
Woodside Building for Technology & Design
Passive House Certified
![](https://rpinfrastructure.com.au/wp-content/uploads/2021/07/20210118-Deakin-WPSA-004-800x478-c-default.jpg)
Waurn Ponds
Student Accommodation Development
![](https://rpinfrastructure.com.au/wp-content/uploads/2021/04/RMIT-B223-ECP-Labs-2_SP-800x478-c-default.jpg)
RMIT Laboratories
Lab upgrades, fit-outs and development
![](https://rpinfrastructure.com.au/wp-content/uploads/2020/11/RMIT-Simulated-Health_SP_2-800x478-c-default.jpg)
Simulated Health Teaching Wards
RMIT University
![](https://rpinfrastructure.com.au/wp-content/uploads/2020/08/200003_Building_NS_Waurn_Ponds_Geelong_014_photoshop_Lowres-800x478-c-default.jpg)
Institute of Intelligent Systems Research and Innovation
(IISRI) Development
![](https://rpinfrastructure.com.au/wp-content/uploads/2020/12/The-Capitol_Theatre-RP25yr_1_PP_LR-800x478-c-default.jpg)
The Capitol
Refurbishment
![](https://rpinfrastructure.com.au/wp-content/uploads/2018/11/Deakin_Burwood_Accommodation_Exterior_1-800x478-c-default.jpg)
Burwood Student Accommodation Stage 2
Deakin University
![](https://rpinfrastructure.com.au/wp-content/uploads/2018/07/MLF17_Incubator_00221-800x478-c-default.jpg)
The Incubator
Macquarie University
![](https://rpinfrastructure.com.au/wp-content/uploads/2018/09/RPS_DeakinUni_Waterfront_Stage1_168-800x478-c-default.jpg)
Health Faculty Consolidation Project
Deakin University Geelong Waterfront Campus
![](https://rpinfrastructure.com.au/wp-content/uploads/2018/09/DMS6772_Panorama1_lowres-800x478-c-default.jpeg)
Melbourne School of Engineering Alterations
University of Melbourne
![](https://rpinfrastructure.com.au/wp-content/uploads/2017/02/UNSW-Exterior507-800x478-c-default.jpg)
Electrical Engineering Building
Capital Renewal & Modernisation Project
![](https://rpinfrastructure.com.au/wp-content/uploads/2017/02/DMS0555-web-800x478-c-default.jpg)
Eastern Campus Redevelopment Stage 3B
La Trobe University
![](https://rpinfrastructure.com.au/wp-content/uploads/2017/02/Arts_NIDA_1-800x478-c-default.jpg)
National Institute of Dramatic Art
Long standing partnership
![](https://rpinfrastructure.com.au/wp-content/uploads/2017/02/140312-UNSW-Kensington-Colleges-1380-800x478-c-default.jpg)
The Kensington Colleges
Student Accommodation Development
![](https://rpinfrastructure.com.au/wp-content/uploads/2017/02/Resi_University_Terraces_1-800x478-c-default.jpg)
The University Terraces
Accommodation & Mixed-Use Development
![](https://rpinfrastructure.com.au/wp-content/uploads/2017/03/Tertiary_AFTRS_1-800x478-c-default.jpg)
AFTRS
Relocation
![](https://rpinfrastructure.com.au/wp-content/uploads/2017/02/TertiaryEdu_Wallace_Wurth_1-800x478-c-default.jpg)
Wallace Wurth Building
School of Medicine & Medical Sciences
![](https://rpinfrastructure.com.au/wp-content/uploads/2017/02/TertiaryEdu_Carlton-Connect_1-800x478-c-default.jpg)
Melbourne Connect
Projects characterised by the need to work within complex master-planned environments and to minimise day-to-day operational impacts, and the requirement for bespoke design that will contribute to the university’s sense of place and that will enable leading educational and research outcomes.